Turn-key projects

Feedback

A/S "Preiļu siers" director
Jāzeps Šņepsts
Preiļu siers
Customer: 
Dairy production manufacturer
Type: 
Steam plant with dry type economizer
Parameters: 
8 MW boiler (12 t/h of steam)
Fuel: 
Wood chips/ forestry residues
Location: 
Preiļi, Latvija
Year: 
2015
56.278032,26.721164
Show on map

In 2015 the company UAB “Enerstena” under the contract carried out a reconstruction of boiler plant by installing a biomass (woodchip) 8MW (12t/h) steam boiler and other auxiliary equipment. As a dairy company, we consume large amount of heat for production, and this project provided us with more economical and environment friendly method of obtaining energy. The transition from the use of natural gas to renewable energy resources has substantially reduced the cost of production, which gives us an opportunity to provide greater support for local milk producers and increase the volume of our production in the nearest future. We are grateful to UAB “Enerstena” for the successful implementation of the project.

UAB „Rietavo komunalinis ūkis" Director
Alvydas Rojus
Rietavo komunalinis ūkis
Customer: 
Heat distribution company
Type: 
Hot Water plant with flue gas condenser
Parameters: 
3 MW boiler
Fuel: 
Liquid fuel
Location: 
Rietavas, Lithuania
Year: 
2015
55.724552,21.933395
Show on map

We have been working with the ENERSTENA Group since 2015, having chosen them for their responsible approach to work, the high quality of their products and their flexible cooperation. We are pleased that after commissioning a new boiler plant from them our heat production indicators have improved significantly.

Director
Vidas Kolesinskis
Žemaitijos energija
Customer: 
Independent heat suppliers
Type: 
Hot water plant with flue gas condenser
Parameters: 
5+2 MW boilers
Fuel: 
Wood chips
Location: 
Telšiai, Lithuania
Year: 
2015
55.986978,22.248553
Show on map

UAB Žemaitijos Energija was building and installing a 9.5 MW biofuel boiler house in Telšiai, which is connected to the Telšiai heating networks. Žemaitijos Energija operates as an independent heat producer; and UAB Enerstena was chosen by us as the general contractor for building the boiler house and producing the related technological equipment. Previously, this company had implemented other large energy projects in this region, and when choosing the supplier for the equipment we took into consideration the fact that UAB Enerstena designs and manufactures its own biofuel water heating boilers, condensing economizers and all of the other components installed in the boiler house, which is meaningful when operating and servicing the equipment. We are happy with our choice, and value the high qualifications of the experts of UAB Enerstena in the area of developing biomass combustion technologies. The company has not disappointed us – the technologies installed by Enerstena have met our expectations, and the operational costs and operation efficiency ratios conform to the limits foreseen in the planned Technical Task. The team of professionals at UAB Enerstena has completed their tasks in a timely and qualitative manner. There were no troubles at all, and we can assuredly recommend the company to others.

General Manager of AB Kauno Energija
Rimantas Bakas
Kauno energija, Petrašiūnų power plant
Customer: 
Heat distribution company
Type: 
Hot water plant with flue gas condenser
Parameters: 
2x12 MW boiler
Fuel: 
Wood chips
Location: 
Kaunas, Lithuania
Year: 
2015
54.891319,23.989927
Show on map

We are glad that our boiler houses were reconstructed by the company from Kaunas. By implementing projects for two biofuel boiler houses with a total capacity reaching up to 50 MW, we could significantly reduce the heating costs for the residents of Kaunas, which are now one of the lowest in Lithuania. By producing cheaper heat, these boiler houses (one – in the Petrašiūnai Power Plant; and the other – the Inkaras boiler house) offer serious competition to independent heat producers and prevent them from increasing their prices unreasonably.

Director of “Varėnos šiluma”
Virginijus Guoga
Varėnos šiluma
Customer: 
Heat distribution company
Type: 
Hot Water plant with flue gas condenser
Parameters: 
4,1 MW boiler
Fuel: 
Wood chips
Location: 
Varėna, Lithuania
Year: 
2014
54.21938,24.580871
Show on map

„Varėnos šiluma“ and “Enerstena” signed the boiler modernization agreement, which purpose was to change the used type of fuel from heavy oil to renewable energy sources. On the basis of this agreement a new biomass-fired 4.1 MW water heating boiler was built and flue gas condenser was installed in the thermal-energy sector.  Operating for over 10 years, “Enerstena” has confirmed many times that it provides top-quality services. Operation of its manufactured facilities is especially efficient, easy to understand; their control systems are well thought-out, protecting against “reload”, fire, etc. “Enerstena” offers not only its own manufactured furnaces, flue gas condensers, but also its developed fully-automated condensate treatment system. Reagents specially developed for the system allow for efficient neutralization and clean-up of the condensate.

SIA “Ventspils siltums” director
Arnis Uzaris
Ventspils siltums
Customer: 
Heat distribution company
Type: 
Flue gas condenser
Parameters: 
26 MW boiler
Fuel: 
Wood chips
Location: 
Venspils, Latvia
Year: 
2014
57.388688,21.574087
Show on map

In 2014, UAB “Enerstena” reconstructed the boiler house of PSIA “Ventspils siltums” and installed a 26 MW flue gas condenser for the biomass boilers. The installation of the flue gas condenser has made it possible for our company to save fuel, and therefore increase the efficiency of the thermal energy generated by our woodchip boilers. The humidity level of the woodchips is approximately 40-50%, which is turned into water vapour during the combustion process and is then discharged into the atmosphere. With the help of this new equipment, the heat from the vapour is returned back to the system. This means that the boiler has to operate less frequently to heat the water until the set temperature is reached for releasing it into the heating system. Thanks to the condenser installed by UAB “Enerstena”, the efficiency of our boiler house has increased by an average by 21%, which means that there is a lower consumption of the woodchips used to generate the necessary amount of heat. Also, after the implementation of the project, the amount of hard participle emissions in the flue gas was reduced and the environmental quality of the emissions was significantly improved. We are pleased with the results of this cooperation and appreciate the high quality of work carried out by the UAB “Enerstena” company.

President of Grigeo
Gintautas Pangonis
Grigeo
Customer: 
Paper and wood production company
Type: 
Steam plant with flue gas condenser and dry type ecomomiser
Parameters: 
10 MW (14 t/h steam) boiler
Fuel: 
Wood chips
Location: 
Grigiškės, Lithuania
Year: 
2014
54.671715,25.106265
Show on map

Recently, we have completed the construction of the already second biomass plant and we intend to do without gas. In this way we will reduce the cost of heat necessary for production process. To implement both projects we have chosen ENERSTENA, because we trust the team’s professionalisms and knowledge of the works they perform. In 2010 ENERSTENA installed us 18 MW (26 t/h, 25 bar steam) biomass-fired steam boiler. The boiler itself was manufactured and bought abroad at that time. In 2014 ENERSTENA decided to be the first company in Lithuania to manufacture steam boiler. The innovative company has perfectly coped with this challenge. To produce paper and cardboard, the biomass boiler with 10 MW power (14 t/h, 20 bar steam) and 2 MW flue gas condenser were installed. ENERSTENA has proved that the equipment manufactured in Lithuania and the use of renewable energy sources is possible even in the most complex technological processes. We are proud that the first Lithuanian firetube steam boiler operates namely in our company.

Director General of Visagino Energija
Zigmas Jurgutavičius
Visagino energija
Customer: 
Heat distribution company
Type: 
Hot water plant with flue gas condenser
Parameters: 
8 MW boiler
Fuel: 
Wood chips
Location: 
Visaginas, Lithuania
Year: 
2014
55.602525,26.435335
Show on map

The planned completion date of the project was 30 June 2014, however, ENERSTENA made the effort, found inner reserves and completed the construction works well before the planned date and the quality of work did not suffer from that. ENERSTENA manufactured, installed, tested in the State Enterprise Visagino Energija plant and launched the second 8 MW biomass-fired water boiler with furnace for production of heat and hot water on 04 April 2014. Wider use of renewable energy resources (wood chips) still cheaper at the moment than natural gas at the SE Visagino Energija biomass plant, evaluating biomass price, enables reducing the heat production costs and thus the costs of heating for Visaginas residents and significantly reducing greenhouse gas emissions,  at the same time contributing to the environment preservation. ENERSTENA carried out the works according to the approved work schedule; it performed the works in a qualitative manner and completed them prior to the deadline. All the assembled equipment complies with the strictest quality safety and reliability requirements; the relevant warranty is granted to it and its construction  works.

Director of “Šilutės šilumos tinklai”
Algis Mykolas Šaulys
Šilutės šilumos tinklai
Customer: 
Heat distribution company
Type: 
Hot Water plant
Parameters: 
10 MW boiler
Fuel: 
Wood chips
Location: 
Šilutė, Lithuania
Year: 
2014
55.34262,21.459518
Show on map

In 2010 “Enerstena” designed, manufactured and assembled flue gas condenser for us, which, in my opinion, is one of the most successful investments, helping to significantly increase the efficiency of thermal energy production. It produces up to 25% of thermal energy, which used to be released to the environment together with the smoke and heat the air. In 2014 “Enerstena” built a new 10 MW vertical biomass boiler. The new boiler is incomparable better than the two existing ones. Here everything is automated and controlled by computer. We only have to bring fuel on time and change the ash container.

Acting Director General of “Žemaitijos pienas”
Robertas Pažemeckas
Žemaitijos pienas
Customer: 
Dairy production manufacturer
Type: 
Steam plant
Parameters: 
10 MW (15 t/h steam) boiler
Fuel: 
Wood chips
Location: 
Telšiai, Lithuania
Year: 
2014
55.997345,22.239618
Show on map

Taking into account the increasing prices of energy resources in Lithuania, high intensity of electricity and thermal energy consumption in manufacture and caring for the surrounding environment, “Žemaitijos pienas” initiated the construction of power generation plants using the renewable energy resources. As the carried out study has revealed, currently one of the most economically based and acceptable options is wood-fuelled steam boiler. To implement this project, “Enerstena” was selected, having many years of experience in the area of manufacture of equipment for biomass plants and we are satisfied with its work. The object’s operation started from 10 April 201, although we were able to enjoy the project’s efficiency and benefit already in March, when the launching-coordination works started and the steam was released to the production process. The result of our choice is a smoothly functioning 10 MW steam boiler room fuelled with biomass, cleaner air in Telšiai and preservation of the Earth for future generations.

Production Director of SE “Visagino energija”
Arūnas Kalauskas
Visagino energija
Customer: 
Heat distribution company
Type: 
Hot water plant with flue gas condenser
Parameters: 
8 MW boiler
Fuel: 
Wood chips
Location: 
Visaginas, Lithuania
Year: 
2014
55.597276,26.431317
Show on map

According to the contract signed on 01 March 2012, “Enerstena” built the 8 MW biomass plant (with 16 MW total boiler power) with a flue gas condenser. Technological equipment design, manufacture and assembly works were carried out in high-quality, timely manner, complying with the construction norms and rules and observing all the requirements specified in the contract. 8 MW biomass boiler with a flue gas condenser  was assembled in the biomass plant. All the technological equipment was manufactured according to the standards and diretives. The biomass plant was inspected by the State Energy Inspectorate and approved as suitable for operation.

Farmer
Algimantas Žemaitis
Floriculture farm of Algimantas Žemaitis
Customer: 
Farmer
Type: 
Hot Water
Parameters: 
4 MW boiler
Fuel: 
Natural gas
Location: 
Alytaus district, Lithuania
Year: 
2014
54.396294,24.045876
Show on map

I started my farming activity on 21 July 1991. At the moment we specialise in floriculture and cucumber–growing, with a total area of 35000 sq. m, including 17000 sq. m of greenhouses which are used for growing short-fruited cucumbers, and 18000 sq. m used- for various potted flowers. Climate controls, fertilization and heat are all controlled by computerised equipment. The greenhouses are operated continuously throughout the year, and the heating needs specialist equipment. Following a recommendation, we chose UAB Enerstena to produce our boiler system. Professionals of the company came to me and, having analysed the situation, designed and produced a gas-combusted boiler of 4 MW, to the exact specifications of our agreement. It works perfectly in my farm, and I am very glad of it.

Chairman of the Board of “Vičiūnai” Group
Visvaldas Matijošaitis
Viciunai group
Customer: 
Producer of crab sticks and other products from surimi and fish
Type: 
Steam plant
Parameters: 
9 MW (14 t/h steam) boiler
Fuel: 
Wood chips
Location: 
Plungė, Lithuania
Year: 
2013
55.910784,21.845407
Show on map

Both the economic aspects and ecological issues prompted to shift to biomass. We have discussed the applicability of biomass in our business, carried out economic analysis and the obtained results have shown that we can produce heat at a half price. Moreover, we will reduce the dependence on unpredictable gas prices. Another important issue was environmental – in addition to the main biomass supplier we also intend to involve local farmers. We would like to propose the region’s farmers to clean drainage ditches, forests and to sell this whole wood to our company. “Enerstena” performs the works from idea to key in the energy field. The works include design, equipment manufacture, object construction, testing, commissioning and operation works. The ability to get all this from a single source saves a lot of time and money.

Director of “Jonavos šilumos tinklai”
Alfredas Sadzevičius
Jonavos šilumos tinklai
Customer: 
Heat distribution company
Type: 
Hot water plant with flue gas condenser
Parameters: 
2 x 5 MW boilers
Fuel: 
Wood chips
Location: 
Jonava, Lithuania
Year: 
2013
55.072724,24.279334
Show on map

I am delighted that this project was implemented by Lithuanian company and the money, instead of going out buying gas or boiler equipment from abroad, remain here and promote Lithuanian economy. The reduced heating costs will widen a shopping cart for Jonava people and will become a perfect impulse for local business. All the equipment is manufactured at “Enerstena” production base; the works are carefully monitored and controlled.

Director of “Tauragės šilumos tinklai”
Vaclovas Karbauskis
Tauragės šilumos tinklai, Aerodromo plant
Customer: 
Heat distribution company
Type: 
Hot Water plant
Parameters: 
2 MW boiler
Fuel: 
Wood chips
Location: 
Tauragė, Lithuania
Year: 
2012
55.250366,22.29095
Show on map

The public procurement contract was awarded to “Enerstena”, having ample opportunities and wide experience in the field of biomass plant construction.  After assembling the equipment, the company has carried out their pre-commissioning works, the specialists trained to work the plant’s staff. As a result of the individually installed system, they can remotely advise regarding removal of faults, to control and change the boiler’s combustion modes and parameters. The installed equipment runs properly and without troubles. “Enerstena” ensures warranty service and supply of spare parts, therefore we are confident of continued and reliable operation of the plant.

Director of “Rokiškio psichiatrijos ligoninė”
Algimantas Liausėdas
Rokiškio psichiatrijos ligoninė
Customer: 
Psychiatric hospital
Type: 
Hot Water plant
Parameters: 
0,9 MW boiler
Fuel: 
Wood chips
Location: 
Rokiškis, Lithuania
Year: 
2012
55.955504,25.585925
Show on map

To reduce the country’s dependence on the imported fuel and the impact of fossil fuels on the environment, it is important to use the renewable energy resources as widely as possible. Their use for electricity and thermal energy production create opportunities to reduce the use of the increasingly expensive fossil fuel imports, especially natural gas and oil products. The biomass plant installed by “Enerstena” allows to significantly reduce the costs of heat production and the modernization resulted in the reduction of negative environmental impact caused by the local plant’s atmospheric pollution to the minimum.

Director of “Radviliškio šiluma”
Pranas Mickaitis
Radviliškio šiluma
Customer: 
Heat distribution company
Type: 
Hot water plant with flue gas condenser
Parameters: 
2 x 5 MW boilers
Fuel: 
Wood chips, peat, straw
Location: 
Radviliškis, Lithuania
Year: 
2009
55.81084,23.546487
Show on map

First of all, I would like to praise trying to receive feedback from the customers – this is very correct, business attitude to the carried out works. I believe that the customers’ opinion directly affects your future initiatives. I am content with the work of “Enerstena”, we are maintaining good relations with this company. The works were carried out in top-quality and timely manner, complying with the construction norms and rules and observing all the contractual requirements. The object was acknowledged as suitable for use by the State Energy Inspectorate under the Ministry of Energy.

Director of “Šakių šilumos tinklai”
Laimutis Kasparavičius
Šakių šilumos tinklai
Customer: 
Heat distribution company
Type: 
Hot Water
Parameters: 
4x0,46 MW boilers
Fuel: 
Straw
Location: 
Gelgaudiškis, Lithuania
Year: 
2007
55.079978,22.97751
Show on map

The company carries out a wide range of activities. It does not restrict itself to only popular biomass plants; it also builds the plants, using as a fuel natural gas, liquefied or biogas, diesel, fuel oil, liquid furnace fuel, pellets and even straw. Straw is classified as a renewable energy resource. Heat generated from straw is usually cheaper than from fossil fuels.